1. OYAK – ELAZIG ALTINOVA CIM. SAN. TIC. A.S. ( DAL TEKNİK ) / 2003 – 2004

    Elazıg Cement Plant

14.1. Erection of the rotary kiln ( KHD – Ø 4,0 x 59 m ).

14.2. Fabrication of the whole local equipments like cyclones, inlet chamber dust ducts e.t.c. located on preheater tower and installation of them as well.

         Weight of fabrication works: 650 ton

         Weight of erection works: 1200 ton

 

  1. NUH CIMENTO SAN. A.S. ( GULERMAK ) / 2004

    Nuh Cement Plant

15.1. Erection of the rotary kiln number III. ( FLS – Ø 5,5 x 66 m ).

Weight of erection works: 1100 ton

 

  1. BPB GYPSUM URETIM VE TIC. LTD. STI. / 2004

    Hasanoglan Plaster Plant

16.1. Dust sealing works for the screw conveyors, belt conveyors, cyclones and pipe lines for the perlite unit.