2002 Past Project Experience
- OYAK – ELAZIG ALTINOVA CIM. SAN. TIC. A.S. ( DAL TEKNİK ) / 2003 – 2004
Elazıg Cement Plant
14.1. Erection of the rotary kiln ( KHD – Ø 4,0 x 59 m ).
14.2. Fabrication of the whole local equipments like cyclones, inlet chamber dust ducts e.t.c. located on preheater tower and installation of them as well.
Weight of fabrication works: 650 ton
Weight of erection works: 1200 ton
- NUH CIMENTO SAN. A.S. ( GULERMAK ) / 2004
Nuh Cement Plant
15.1. Erection of the rotary kiln number III. ( FLS – Ø 5,5 x 66 m ).
Weight of erection works: 1100 ton
- BPB GYPSUM URETIM VE TIC. LTD. STI. / 2004
Hasanoglan Plaster Plant
16.1. Dust sealing works for the screw conveyors, belt conveyors, cyclones and pipe lines for the perlite unit.