1. DENIZLI CIMENTO SAN. TIC. A.Ş. ( TIMSAN A.S. ) / 2005 – 2006

    Denizli Cement Plant

25.1. Fabrication of the local equipments for the clinker stock hall with the capacity of 90.000 ton and installation of them.

 

  1. SANKO – CIMKO CIMENTO VE BETON SAN. TIC. A.S. / 2005 – 2006

    Adıyaman Cement Plant

26.1. Erection and fabrication works of the cement mill.

( UDCM – Ø 3,8 x 13 m )

Weight of the local fabrication worksi: 1050 ton

Weight of the Installation works: 1500 ton

 

  1. VICAT – BASTAS BASKENT CIMENTO SAN. TIC. A.S. / 2006

    Bastas Cement Plant

27.1. Maintenance works for the clinker cooler

27.2. Maintenance works for the stacker and reclaimer

 

  1. TURKERLER INS. TURIZM MADENCILIK TIC. SAN. A.S. / 2006

    Ladik Cement Plant

28.1. Fabrication of the inlet gas duct of the electrostatic precipitator as weel   

as the expansion joint.

 

 

 

  1. AS CIMENTO SAN. TIC. A.S. / 2006

    Kızılkaya Cement Plant – LM 56.3 + 3

29.1. Fabrication and installation works for Loesche cement mill unit

( Capacity: 210 ton/h ).

Weight of the local fabrication works: 440 ton

Weight of the Installation works: 1228 ton