2006 Past Project Experience
- DENIZLI CIMENTO SAN. TIC. A.Ş. ( TIMSAN A.S. ) / 2005 – 2006
Denizli Cement Plant
25.1. Fabrication of the local equipments for the clinker stock hall with the capacity of 90.000 ton and installation of them.
- SANKO – CIMKO CIMENTO VE BETON SAN. TIC. A.S. / 2005 – 2006
Adıyaman Cement Plant
26.1. Erection and fabrication works of the cement mill.
( UDCM – Ø 3,8 x 13 m )
Weight of the local fabrication worksi: 1050 ton
Weight of the Installation works: 1500 ton
- VICAT – BASTAS BASKENT CIMENTO SAN. TIC. A.S. / 2006
Bastas Cement Plant
27.1. Maintenance works for the clinker cooler
27.2. Maintenance works for the stacker and reclaimer
- TURKERLER INS. TURIZM MADENCILIK TIC. SAN. A.S. / 2006
Ladik Cement Plant
28.1. Fabrication of the inlet gas duct of the electrostatic precipitator as weel
as the expansion joint.
- AS CIMENTO SAN. TIC. A.S. / 2006
Kızılkaya Cement Plant – LM 56.3 + 3
29.1. Fabrication and installation works for Loesche cement mill unit
( Capacity: 210 ton/h ).
Weight of the local fabrication works: 440 ton
Weight of the Installation works: 1228 ton