2008 Past Project Experience
- CIMSA CIMENTO SAN. TIC. A.S. / 2007 – 2008
Eskisehir Cement Plant
38.1. Erection of the rotary kiln unit (FLS – Ø 3,6 x 55 m ).
38.2. Erection of the Clinker cooler unit ( FLS ).
38.3. Erection of the electrostatic presipitator for the Clinker cooler ( FLS ).
38.4. Erection of the clinker transport lines.
Total weight of the erection works: 1600 ton
- AS CIMENTO SAN. VE TIC. A.S. / 2007 – 2008
Kızılkaya Cement Plant
Clinker production line number II.
39.1. Erection of the raw mill unit and local fabrication works.
( PFEIFFER AG / MPS 5300 )
39.2. Erection of the coal mill unit and local fabrication works.
( PFEIFFER AG / MPS 3070 )
39.3. Erection of the rotary kiln unit (CITIC – Ø 5,6 x 87 m ).
39.4. Erection of the clinker cooler unit ( IKN ).
Weight of the local fabrication works: 2100 ton
Weight of the erection works: 5050 ton
- VICAT – KONYA CIMENTO SAN. A.S. / 2008
Konya Cement Plant
40.1. Replacement work of the casing of the cement mill number I.
( FCB – Horomill – 1 / Ø 3800mm )
- AS CIMENTO SAN. TIC. A.S. / 2008
Kızılkaya Cement Plant.
41.1. Erection of the Clinker silo with the capacity of 30000 ton and local fabrication works.
Weight of the local fabrication works: 1200 ton
Weight of the erection works: 2200 ton
- KIPAS KAHRAMANMARAS CIMENTO SAN. TIC. A.S. (SARHAN) / 2008
Kahramanmaras Cement Plant
Clinker production line number 1.
42.1. Erection of the rotary kiln unit ( KHD – Ø 4,6 x 54 m ).
42.2. Erection of the clinker cooler unit and transport line (KHD – Pyrofloor ).
42.3. Erection of the raw mill. ( PFEIFFER AG / MPS 4500 ).
Total weight of the erection works: 2400 ton
- CIMSA CIMENTO SAN. TIC. A.S. / 2008
Eskisehir Cement Plant
43.1. Local fabrication, dismantling and installation works for the modernization of the coal transportation system of the clinker production line.
43.2. Replacement of the impeller of the ID fan.
43.3. Replacement of the impeller of the fan for the electrostatic presipitator of the raw mill.
- SET CIMENTO SAN. TIC. A.S / 2008
Balıkesir Cement Plant
44.1. Replacement of the heavy kiln shell with tyre and rollers.
( HUMBOLDT - Ø 3,6 x 54 m ).
- LAFARGE VAN CIMENTO A.S. / 2008
Van Cement Plant
45.1. Fabrication of the light and heavy kiln shell ( Ø 3,6 x 11 m ).
- SET CIMENTO SAN. TIC. A.S / 2008
Ankara Cement Plant
46.1. Replacement of the kiln shell for the rotary kiln number 3 and some revision works ( FCB - Ø 4,4 x 64 m )
46.2. Fabrication of the cyclone for the hot gas line of the coal mill and installation.
- CIMPOR CORUM CIMENTO SAN. TIC. A.S. / 2008
Corum Cement Plant
47.1. Replacement of the casing of the mill number III( KHD / Ø 2,2 x 13 m ).