2009 Past Project Experience
- NUH CIMENTO SAN. A.S. ( ANDRITZ ) / 2008 – 2009
Nuh Cement Plant
48.1. Solid waste disposal facility (sludge drying).
48.2. Both fabrication and installation of some equipments.
- AS CIMENTO SAN. TIC. A.S. / 2008 - 2009
Kızılkaya Cement Plant
49.1. Erection of the raw mill unit. ( Hefei – HRM / 3700 E )
Total weight of the erection works: 350 ton.
- VICAT – BASTAS BASKENT CIMENTO SAN. TIC. A.S. / 2008 – 2009
Bastas Cement Plant
50.1. Solid waste burnning and stocking facility.
Weight of the local fabrication works: 168 ton
Weight of the erection works: 225 ton
- ETI ALUMINYUM A.S. / 2009
Seydisehir Aluminium Facilities
51.1. Revision of the rotary kiln number II (Russian Project / Ø 3,6 x 75 m ).
51.2. Fabrication of the chair pad for the tyre.
- BETA MAKINA / 2009
Ankara gendarmes sewing workshops
52.1. Erection of the steel construction - 265 ton
- CIMPOR YOZGAT CIMENTO SAN. TIC. A.S. / 2009
Yozgat Cement Plant
53.1. Replacement of the casing and impeller of the fan for raw mill.
- CIMPOR SIVAS CIMENTO SAN. TIC. A.S. / 2009
Sivas Cement Plant
54.1. 1.Fabrication of the structure holding the burner pipe of the rotary kiln and replacement of the burner pipe.
54.2. 2. Replacement of the trunnion of the raw mill.
- SYRIA TARTOUS CIMENTO FABRIKASI / 2009
55.1. Replacement of the heavy kiln shell with tyre and rollers and adjustment of the gear. ( Ø 4,6 x 69 m )
- AS CIMENTO SAN. VE TIC. A.S. / 2009
Kızılkaya Cement Plant
56.1. Revision works for clinker silo.
56.2. Revision works for Rotary kiln line 1
56.3. Installation of the packing unit.
56.4. Revision of the elevator for tras dryer.
56.5. Fabrication of the screw conveyors under the filter. ( 60 ton/h – 5 units )
56.6. Fabrication of the chair pad for the tyre of the rotary kiln.
56.7. Fabrication of the driver and carrier shafts for crusher.
56.8. Erection of the Mass machine cement cooler unit
- VICAT – BASTAS BASKENT CIM. SAN. VE TIC. A.S. / 2009
Bastas Cement Plant
57.1. Fabrication of the beams for Loesche mill
57.2. Fabrication of the discahrge chute
57.3. Fabrication rotary valve for waste burnning facility.
57.4. Replacement of the valves at the waste burnning facility
57.5. Fabrication of the upper pulley of the elevator for the cement mills number 1 and 2.
- OYAK BOLU CIMENTO SAN. A.S. / 2009
Ankara Grinding Facility
58.1. Fabrication of the bucket for packing unit. ( 400mm - 500mm - 630mm )
- SET CIMENTO SAN. VE TIC. A.S. / 2009
Balıkesir Cement Plant
59.1. General revision work for the clinker cooler. ( IKN ) Fabrication and erection works.
59.2. Modification works for the bag filter with the capacity of 15.000 m2/h
59.3. Insulation works for the hot gas pipe.
- CIMKO CIMENTO VE BETON SAN. A.S. / 2009
Kahramanmaras Cement Plant
60.1. Fabrication works for the pan conveyor number L11.01.01 and L11.01.02
60.2. Measuring works for rotary kiln
60.3. Revision of the inlet seal for the rotary kiln.
60.4. Revision of the electrostatic presipitator for klinker cooler.
60.5. Fabrication of the expansion joint for cooling tower. ( Ø 3020 x1260mm)
60.6. Execution of the cement transport line( Project, fabrication ,installation )
60.7. Execution of the elevator for the cement transportation and it’s tower
( 200 t/h, 28 mt – Project ,fabrication ,installation)
60.8. Fabrication of the outlet kiln shell of the rotary kiln ( Ø5500 x 1450 mm )
60.9. Replacement of the burner pipe.
60.10. Fabrication of the air-slide ( 630 mm )
60.11. Replacement of the rotor for crusher.
60.12. Replacement of the sleeve of the raw mill
- CIMPOR CORUM CIMENTO SAN. TIC. A.S. / 2009
Corum Cement Plant
61.1. Replacement of the cement ball mill shell ( Ø 3,8 x 13 m )
61.2. Fabrication and installation of the base frame of the gearbox and
motor of the Raw mill. ( KHD – Ø 2,2 x 13 m )
61.3. Cold Measuring the alignment of the Rotary Kiln.
61.4. Replacement of the chair pad under the tyre of the rotary kiln.