2010 Past Project Experience
- VICAT – KONYA CIMENTO SAN. A.S. / 2009 – 2010
Konya Cement Plant
62.1. Fabrication and replacement of the outlet kiln shell of the rotary kiln
number II ( Ø 4200 x 825 mm ).
- ASKALE CIMENTO SAN. TIC. A.S. / 2009
Trabzon Cement Plant
63.1. Fabrication of the beam under the rail for the overhead crane in the stockhall.
63.2. Fabrication of the pulley of the cooling ventilator.
63.3. Fabrication of the seperation valve for air-slide ( 300 mm - 2 units).
63.4. Fabrication of the casing and buckets of the Aumund elevator (5 units ).
63.5. Fabrication of the ventilator pulley of the elevator number 3.
- SET CIMENTO SAN. TIC. A.S / 2009 - 2010
Pınarhisar Cement Plant
64.1. Extension of the length of the precalcination for the rotary kiln no. II.
( Project – Fabrication – Erection )
- DENIZLI CIMENTO SAN. TIC. A.S. / 2010
Denizli Cement Plant
65.1. Modification works for the cyclone DF-1 SO4.
65.2. Fabrication and installation works for the hot gas duct between cogeneration and raw mill number 3.
- AS CIMENTO SAN. TIC. A.S. / 2010
Kızılkaya Cement Plant
66.1. Replacement of the outlet trunnion of the cement mill number II and adjustment of the drive unit.
66.2. Installation of the rotary scale for the packing unit number IV.
66.3. Fabrication and installation works of the steel silo and transport lines.
( 1500 ton )
66.4. Fabrication and installation works of the steel silo and transport lines.
( 1000 ton )
66.5. Revision of the gearbox of the raw mill number MPS 5300.
66.6. Revision of the rotary kiln number 2 and replacement of the burner pipe of the rotary kiln.
- ASKALE CIMENTO SAN. TIC. A.S. / 2010
Askale Cement Plant
67.1. Fabrication of the casing of the crusher of the trass.
67.2. Fabrication of the weighing hopper of raw mill.
67.3. Fabrication of the casing of the crusher for the rotary kiln number II.
- SANKO – CIMKO CIMENTO FABRIKASI / 2010
Kahramanmaras Cement Plant
68.1. Fabrication of the outlet kiln shell of the rotary kiln ( Ø 5.6 x 1.45 mt. ).
68.2. Fabrication of the slide gate valve ( DN 800 ).
68.3. Fabrication of the retaining ring for rotary kiln.
68.4. Fabrication of the protector for switch.
68.5. Revision works for the clinker production line.
68.6. Belt conveyor ( 200T/h - 3 unit ) (project, fabrication, installation).
68.7. Fabrication of the seperation valve for air slide ( 315 mm. ).
68.8. Fabrication of the valves for the feeding pipes in preheater tower.
68.9. Fabrication of the sealing and extension parts of the tertiary air duct.
68.10. Replacement of the louvres of the seperators for the cement mills number I. II. III..
68.11. Execution of the overhead cranes and bridges( 20 Ton, 2 Ton, 1 Ton ) ( Project , fabrication, installation ).
68.12. Various steel and platform works ( 55 Ton )
68.13. Various steel and platform works ( 36 Ton )
68.14. Fabrication of the casing of the air slide ( 315 mm )
68.15. Cement transportation line and bridges for the air slides.
- OYAK – MARDIN CIMENTO SAN. TIC. A.S. / 2010
Mardin Cement Plant
69.1. Revision of the rotary kiln number I and replacment of the kiln shell and tyre.
69.2. Revision of the elektrostatic presipitator for raw mill, replacement of the collecting and discharge electrodes.
68.3. General revision works for preheater tower
68.4. Fabrication of the chair pad for rotary kilns number I.and II.
68.5. Fabrication of the base frame for the ventilator of the gas of chimney.
- VICAT – KONYA CIMENTO SAN. A.S. / 2010
Konya Cement Plant
70.1. Revision of the electrostatic precipitator for raw mill ( Redecam).
70.2. Fabrication of the casing of the gear box for the overhead crane.
- CIMSA CIMENTO SAN. TIC. A.S. / 2010
Mersin Cement Plant
71.1. Adjustment of the drive unit and gear of the rotary( FLS - Ø5.5 x 87 m ).
- SET CIMENTO SAN. TIC. A.S. / 2010
Ambarlı Cement Grinding and packing Facility
72.1. Revision of the cement mills number I. and II.
- SET CIMENTO SAN. TIC. A.S. / 2010
Pınarhisar Cement Plant
73.1. Revision of the rotary kiln number II.
( Replacement of the heavy kiln shell together with tyre ).
73.2. Revision of the IHI raw mill and replacement of the rotor of
the seperator.
73.3. 2. Manufacturing and installation of Cement Mill body outlet side.
( Ø 3,8 x 11 m )
73.4. Replacement of the outlet bearing of the cement mill number 2.
Ankara Cement Plant
73.5. Fabrication and installation of the hot gas pipe of the clinker cooler for the rotary kiln number 3.
- CIMPOR CORUM CIMENTO SAN. TIC. A.S. / 2010
Corum Cement Plant
74.1. Revision of the rotary kiln.
- CIMPOR YOZGAT CIMENTO SAN. TIC. A.S. / 2010
Yozgat Cement Plant
75.1. General modification works for clinker cooler unit ( Fabrication and installation of the both fix and movable frames e.t.c.).
- OYAK BOLU CIMENTO SAN. TIC. A.S. / 2010
Eregli Cement Grinding Facility – Loesche LM 53. 3+3
76.1. Local fabrication and installation works for the grinding.
Weight of the local fabrication works: 400 ton
Weight of the installation works: 1350 ton
- VICAT – KONYA CIMENTO SAN. A.S. / 2010
Konya Cement Plant
77.1. Fabrication and installation works for the clinker transporatation system
Weight of the local fabrication works: 142 ton
Weight of the installation works: 215 ton