2011 Past Project Experience
- RENAISSANCE CONSTRUCTION - RUSSIA / 2010 – 2011 ( NORM-CCM )
Verhnebakansky Cement Plant
6200 Tpd. Fabrication and Installation Works For The Complete
Cement Production Line
78.1. Raw mill feeding.
78.2. Erection of the electrostatic presipitator for raw mill.
78.3. Installation of the equipments located on the preheater tower.
78.4. Installation of the rotary kiln unit.
78.5. Installation of the clinker cooler unit and electrostatic presipitator
78.6. Fabrication of the cyclones and gas ducts ( 2250 ton ).
- SET CIMENTO SAN. TIC. A.S. / 2010
Ankara Cement Plant
79.1. Revision of the rotary kiln number II ( Ø 4,2 x 60 m ).
79.2. Replacement of the heavy kiln shell together with tyre.
- OYAK – MARDIN CIMENTO SAN. TIC. A.S. / 2010
Mardin Cement Plant
80.1. Fabrication of the chair pad and support plates for tyre.
- CIMSA CIMENTO SAN. VE TIC. A.S. / 2010 – 2011
Eskisehir Cement Plant
81.1. Extension of the calcination in facility-I.
Fabrication works: 425 ton
Installation works: 380 ton
Dismounting works: 106 ton
- VICAT – KONYA CIMENTO SAN. A.S. / 2010 – 2011
Konya Cement Plant
82.1. Both fabrication and installation of the beams for Loesche raw mill.
- SANKO – CIMKO CIMENTO FABRIKASI / 2010 – 2011
Kahramanmaras Cement Plant
83.1. Fabrication of the guillotine valve with actuator
( 2440 x 2440mm ) - 3 units
( 1700 x 1200mm ) - 4 units
( P200 x 300mm ) - 4 units
- CIMSA CIMENTO SAN. VE TIC. A.S. / 2010 – 2011
Mersin Cement Plant
84.1. Replacement of the kiln shell on which Girth Gear is located.
( FLS – Ø 5,2 x 6m )
- VICAT – KONYA CIMENTO SAN. A.S. / 2010 – 2011
Konya Cement Plant
85.1. Fabrication and replacement of the heavy kiln shell together with tyre and also fabrication and installation of the inlet and outlet section of the rotary kiln number I ( KHD – Ø 4,2 m )
- CIMSA CIMENTO SAN. VE TIC. A.S. / 2010-2011
Eskisehir Cement Plant
86.1. Replacement of the heavy kiln shell inlet and outlet side together
with tyre. ( MIAG - Ø 3,6 m )
- OYAK BOLU CIMENTO SAN. TIC. A.S. / 2011
Eregli Cement Grinding Facility
87.1. Execution of the cement silo with the capacity of 550 ton ( 2 units )
- CIMPOR ANKARA CIMENTO SAN. TIC. A.S. / 2011
Ankara Hasanoglan Cement Plant
88.1. Replacement of the burner pipe of the rotary kiln.
- CIMPOR YOZGAT CIMENTO SAN. TIC. A.S. / 2011
Yozgat Cement Plant
89.1. Replacement of the burner pipe of the rotary kiln.
- ASKALE CIMENTO SAN. TIC. A.S. / 2011
Askale Cement Plant
90.1. Revision of the raw mill.
90.2. Revision of the rotary kiln and preheater tower.
90.3. Replacement of the beams and maintenace works for
the clinker stockhall.
- SANKO – CIMKO CIMENTO FABRIKASI / 2011
Kahramanmaras Cement Plant
91.1. Dismounting, maintenance and installation of the gear box of
the raw mill number 3.
91.2. Replacement of the fans for clinker cooler.
91.3. Replacement of the gear of the main drive of the rotary kiln.
- VICAT – KONYA CIMENTO SAN. A.S. / 2011
Konya Cement Plant
92.1. Execution of the 150 m3 coal silo (Project, Fabrication and installation).
Weight of the fabrication works: 125 ton
Weight of the installation works: 140 ton
Weight of the dismounting works: 10 ton
- CIMSA CIMENTO SAN. VE TIC. A.S. / 2011
Eskisehir Cement Plant
93.1. Installation of the “HOT DISK REACTOR” for the facility
number 2 and fabrication of some equipment for this Project.
Weight of the fabrication works: 115 ton
Weight of the installation works: 360 ton
Weight of the dismounting works: 120 ton
- CIMSA CIMENTO SAN. VE TIC. A.S. / 2011
Nigde Cement Plant
94.1. Revision of the rotary kiln. ( KHD - Ø 3,8 x 54 m )