2012 Past Project Experience
- OYAK BOLU CIMENTO SAN. TIC. A.S. / 2012
Bolu Cement Plant
95.1. Revision of the rotary kiln ( KHD - Ø 4,6 x 64 m ).
Replacement of the both tertiary air duct and kiln hood.
Replacement of the outlet part of the rotary kiln, outlet side tyre and
rollers.
Adjustment of the girth gear.
95.2 Maintenance of the cyclones in the preheater tower.
Dismounting of the cyclones number O1 and V1 and installation of the
new ones.
- BEUMER MASHINENFABRIK GMBH. / 2012
96.1. Fabrication of the various kind of elevator casing: 160 ton
- CIMPOR SIVAS CIMENTO SAN. TIC. A.S. / 2012
Sivas Cement Plant
97.1. Replacement of the burner pipe of the rotary kiln.