2014 Past Project Experience
- OYAK UNYE CIMENTO SAN. TIC. A.S. / 2014
Unye Cement Plant
107.1. Fabrication of the dryer shell and gas line equipments for the ATY
system and maintenance, installation, commisionning works.
( Ø 3,0 x 25 m )
- VICAT – KONYA CIMENTO SAN. A.S. / 2014
Konya Cement Plant
108.1. Converting the chair pads to sliding system. ( Ø 4,2 m )
- YURT CIMENTO SAN A.S. / 2014
Mus Cement Plant
109.1. Replacement of the kiln shell. ( Ø 4,15 x 1,0 m )
- CIMSA CIMENTO SAN. VE TIC. A.S. / 2014
Kayseri Cement Plant
110.1. Dismounting and installation works for ID fan.
- LAFARGE EREGLI CIMENTO SAN VE TIC A.S. / 2013 – 2014
Eregli Cement Grinding Facility
111.1. Replacement of the shell of the cement mill and the girth
gear- pinion
- CIMSA CIMENTO SAN. VE TIC. A.S. / 2014
Kayseri Cement Plant
112.1. Installation and fabrication works for the transport line of the clinker
with trass.
- DENIZLI CIMENTO SAN. A.S. / 2012 – 2013
Denizli Cement Plant
113.1. Fabrication and replacement of the kiln shell for the rotary kiln
number-1 (Ø 4,6 x 7,5 m / Ø 4,6 x 2,6 m)
- OYAK – MARDIN CIMENTO SAN. TIC. A.S. / 2013
Mardin Cement Plant
114.1. Fabrication and replacement of the outlet kiln shell ( Ø 4,6 x 1,6 m )
- NUH CIMENTO SANAYI A.S. / 2013
115.1. Preperation of the heavy kiln shell together with tyre for
the rotary kiln number 3 on the ground as a spare part.
( FLS - Ø 5,5 x 2,8 m and Tyre )
- OYAK – MARDIN CIMENTO SAN. TIC. A.S. / 2013
Mardin Cement Plant
116.1. Fabrication and replacement of the kiln shell for the rotary kiln
number-1 ( Ø 4,6 x 2,6m ).
- CIMPOR YOZGAT CIMENTO SAN. TIC. A.S. / 2013
Yozgat Cement Plant
117.1. Fabrication of the two way valve for the inlet of the raw mill.
- DENIZLI CIMENTO SAN. A.S. / 2014
Denizli Cement Plant
118.1. Fabrication and replacement of the kiln shell for the rotary kiln no-1.
( Ø 4,6 x 6,3 m )
- TRACIM CIMENTO SANAYI VE TICARET A.S. / 2013 – 2014
Vize Cement Plant
119.1. Fabrication, installation and commisionning works of the roller press unit for the cement mill number-1
Project: SINOMA-CHINA, Model: TRD 140/140, Capacity: 500/650 ton
- SANCIM CIMENTO SANAYI VE TICARET A.S. / 2014
Bilecik Cement Plant
120.1. Fabrication of the kiln shell ( Ø 4,6 x1,0 m )
- SANKO – CIMKO CIMENTO FABRIKASI / 2014
Kahramanmaras Cement Plant
121.1. Replacement of the outlet kiln shell ( Ø 5,5 x 1,45 m )
- CIMSA CIMENTO SAN. TIC. A.S. / 2014
Eskisehir Cement Plant
122.1. Replacement of the kiln shell ( Ø 3,6 x 18 m )
( FLS – Ø 3,6 x 55 m )
122.2. Fabrication and installation of the tertiary air duct
- CIMSA CIMENTO SAN. TIC. A.S. / 2014
Eskisehir Cement Plant
123.1. Modernization of the pipes of the ID fan for the facility number 1.
- CIMSA CIMENTO SAN. TIC. A.S. / 2014
Eskisehir Cement Plant
124.1. Civil and mechanical works of the kiln feeding system for the facility
number 1
- UST YAPI MADENCILIK A.S. / 2014
Kav-cim Kavak Cement Plant
125.1. Fabrication and installation works of the stacker and reclaimer system
for the coal stock hall.
125.2. Fabrication and installation works of the stacker and reclaimer system
for the raw metarial stock hall.
125.3. Fabrication and installation works of the stacker and reclaimer system
for the additive stock hall.
- UST YAPI MADENCILIK A.S. / 2014
Kav-cim Kavak Cement Plant
126.1. Fabrication and installation of the kiln shells. ( Ø 4,65 x 59 m )
- TOROS TARIM A.S. / 2014
Samsun Plant
127.1. Fabrication and replacement of the tyres, kiln shells under the tyre and
pulley of the dryer for the NPK unit NPK.
( Ø 3,6 x 1,3 m with Ring) / ( Ø 3,6 x 1,8 m with Ring)
- CINKOM CINKO KURSUN METAL VE MADENCILIK SAN. TIC. A.S. / 2014
Kayseri Plant
128.1. Fabrication of the kiln shell for the teksif rotary kiln ( Ø 2,6 x 14,85 m )
- OYAK – MARDIN CIMENTO SAN. TIC. A.S. / 2014
Mardin Cement Plant
129.1. Fabrication of the outlet kiln Shell fort he rotary kiln number II.
( Ø 4,35 x 1,6 m )
- VICAT – BASTAS BASKENT CIM. SAN. VE TIC. A.S. / 2014
Bastas Cement Plant
130.1. Replacement of the chair pads for the rotary kiln number II
130.2. Replacement of the cyclones
130.3. Replacement of the pipes located on the preheater tower
( +120 m from the ground level.)
130.4. Fixation and installation of the screw conveyor inside the hopper for
the wasting system
130.5. Fabrication of the steel and technological equipments related to this
job and insulation works for this project.
- SANKO – CIMKO CIMENTO FABRIKASI / 2014
Kahramanmaras Cement Plant
131.1. Replacement of the outlet kiln shell ( Ø 5,6 x 1,45 m )
131.2. Replacement of the inlet sealing of the rotary kiln.
131.3. Modification of the expansion joint at the tertiary air duct.
131.4. Installation of the weighing machine for clinker and modification of the
feeding station.
131.5. Modification of the system fans for the coal mill.
131.6. Replacement of the movable louvres of the coal mills.
- VICAT – BASTAS BASKENT CIM. SAN. VE TIC. A.S. / 2014
Bastas Cement Plant
132.1. Fabrication and installation of the hopper for the roller press unit BK-2.
- VITKOVICE GEARWORKS A.S. / 2014
133.1. Erection of Bridge Scraper Machine – MBSK 600