2015 Past Project Experience
- NUH CIMENTO SANAYI A.S. / 2015
134.1. Installation of the heavy kiln shell section of the rotary kiln number 3
together with the tyre ( FLS – Ø 5,5 x 2,8 m )
- NUH CIMENTO SANAYI A.S. / 2015
135.1. Revision of the inlet chamber of the electrostatic precipitator for clinker
cooler for the clinker production line number 3
- SANKO – CIMKO CIMENTO FABRIKASI / 2015
Kahramanmaras Cement Plant
136.1. Fabrication of the outlet kiln shell section ( Ø 5,6 x 1,6 m )
- CIMSA CIMENTO SAN. VE TIC. A.Ş. / 2015
Kayseri Cement Plant
137.1. Fabrication and installation works for the dust coal
- VOTORANTIM CIMENTO SAN. TIC. A.S. / 2015
Samsun Cement Grinding Facility
138.1. Revision of the concrete support for the main drive unit of
the cement mill and replacement of the gear.
- TURKMEX CINKO OKSIT VE CINKO SULFAT FABRIKASI A.S. / 2015
Izmir Aliaga Facility
139.1. Fabrication and installation of the dryer shell ( Ø 3,0 x 18,288 m )
- OYKA KAGIT AMBALAJ SANAYI VE TIC. A.S. / 2015
Caycuma Plant
140.1. Fabrication of the Trommel used for peeling of the trunks for
making paper ( Ø 4,0 x 18 m ).
- ORMAKSAN HIDROLIK VE MAKINE SAN VE TIC LTD. STI / 2015
Equatorial Guinea
141.1. Fabrication of the BSD Equipments for one of the FLS Project.
( Rotary kiln sections, casing of the raw mill, casing of the seperator e.t.c.)
Weight of the fabrication works: 678 Ton.
- ERMADEN ERDEMIR MADENCILIK SAN. VE TIC. A.S. / 2015
Divrigi Facility
142.1. Replacement of the part on the shell of the ball mill
( Ø 4400 x 7020 mm )
- CIMSA CIMENTO SAN. TIC. A.S. / 2015
Eskişehir Cement Plant
143.1. SNCR Fabrication and installation Ammoniac Tankı ( 75 m² ).
- CIMSA CIMENTO SAN. TIC. A.S. / 2015
Mersin Cement Plant
144.1. SNCR Fabrication and installation Ammoniac Tankı ( 75 m² ).
- VICAT BASTAS BASKENT CIMENTO SAN. TIC. A.S. / 2015
Bastas Cement Plant
145.1. Waste Foundry Sand Feeding System.
(Project, Fabrication, Installation)
- VICAT BASTAS BASKENT CIMENTO SAN. TIC. A.S. / 2015
Bastas Cement Plant
146.1. Converting the chair pads to sliding system ( Rotary Kiln-1, Station-3 ).
- CIMSA CIMENTO SAN. TIC. A.S. / 2015
Eskisehir Cement Plant
147.1. Civil and mechanical works for the dedusting system of
the wagon loading system for the facility number II.
- GOLTAS GOLLER BOLGESI CIMENTO SAN. TIC. A.S. / 2015
Isparta Cement Plant
148.1. Replacement of electrostatic precipitator to bag filters for Line1 and 2,
148.2. Dismounting and installation works
- SANCIM CIMENTO SAN. TIC. A.S. / 2015
Bilecik Cement Plant
149.1. Revision of the rotary kiln – Ø 4,6 m
149.2. Maintance and calibration
- BATICIM BATI ANADOLU CIMENTO SAN. A.S / 2015
Soke Cement Plant
150.1. Fabrication and installation works for the roller press unit
Weight of the fabrication works: 452 Ton.
Weight of the installation works: 600 Ton.
- SANKO – CIMKO CIMENTO FABRIKASI / 2015
Kahramanmaras Cement Plant
151.1. Replacement of bearings for Roller Press.